{"id":3973,"date":"2012-12-11T17:19:43","date_gmt":"2012-12-11T17:19:43","guid":{"rendered":"http:\/\/www.www.terre-armee.fr\/?p=3973"},"modified":"2020-01-10T19:00:03","modified_gmt":"2020-01-10T19:00:03","slug":"australia-regional-rail-link-west-werribee-junction","status":"publish","type":"post","link":"https:\/\/www.terre-armee.fr\/en\/australia-regional-rail-link-west-werribee-junction\/","title":{"rendered":"AUSTRALIA – Regional Rail Link, West Werribee Junction"},"content":{"rendered":"
For this significant project, RECO Australia\u00a0provided several Reinforced Earth\u00ae structures. On the West Werribee Junction section,\u00a0RECo Australia was required to design and supply\u00a0two Reinforced Earth\u00ae retaining walls\u00a0and\u00a0six flyover walls\u00a0for\u00a0a\u00a0total surface of 5,517 m\u00b2.<\/p>\n
The global project is composed of\u00a090 km of new tracks, five new and upgraded railway stations, 40 bridges, 13 grade separations, and thousands of kilometres of wiring and conduits. Due to the project\u2019s size and complexity, the RRL Project was\u00a0divided into six construction packages.<\/p>\n
The RRL was awarded in 2014 the\u00a0best Australian project of the year at the Infrastructure Partnerships Australia\u2019s (IPA) National Infrastructure Awards. In 2015, it has been recognized as the\u00a0winner of the Australian Construction Achievement Award 2015\u00a0by the Australian Constructors Association (ACA) and Engineers Australia (EA)<\/p>\n
Specifications<\/strong>
\n– Total area: 5,517 m\u00b2<\/strong>
\n– Max. height:\u00a09 m<\/strong>
\n– Design load:\u00a020kPa<\/strong><\/p>\n<\/div>Localisation<\/h2>\n<\/div>