{"id":4053,"date":"2015-10-14T09:32:48","date_gmt":"2015-10-14T09:32:48","guid":{"rendered":"http:\/\/www.www.terre-armee.fr\/?p=4053"},"modified":"2020-01-10T18:55:13","modified_gmt":"2020-01-10T18:55:13","slug":"serbia-access-ramps-in-reinforced-earth-for-the-bridge-europa-in-novi-sad","status":"publish","type":"post","link":"https:\/\/www.terre-armee.fr\/en\/serbia-access-ramps-in-reinforced-earth-for-the-bridge-europa-in-novi-sad\/","title":{"rendered":"SERBIA – Access ramps in Reinforced Earth\u00ae for the bridge Europa in Novi Sad"},"content":{"rendered":"

<\/div>
<\/div>
<\/div>

This summer, Freyssinet Ogranak Belgrade achieved the construction of the\u00a0two access ramps in Reinforced Earth\u00ae for the Bridge Europa in Novi Sad, Serbia.<\/h2>\n

Terre Arm\u00e9e France<\/strong>, who was in charge of the\u00a0design and supply of materials and molds<\/strong>, proposed\u00a0Geostrap\u00ae<\/sup> strips with TerraPlus\u00ae<\/sup> concrete panels<\/strong>\u00a0in order to have the quickest solution for precasting and erection.
\nFreyssinet<\/strong>\u00a0insured the\u00a0installation of panels and strips<\/strong>\u00a0and a technical assistance to the main contractor West Gradnja for precasting.<\/p>\n

2 150 m\u00b2 of walls were built for a maximum height of 7,70 m.\u00a0\u00a0<\/strong><\/p>\n<\/div>

<\/div><\/div><\/div><\/div><\/div>

Localisation<\/h2>\n<\/div>